**Project costs are budgets including contingencies.
*Building addition consisting of Instrumental and choral/general music rooms (2), General education classrooms (4), Small group instruction (2), AND Reconfiguration of classrooms into SGIs AND expansion of the existing science classroom.
The Boonton Township School District has worked closely with our architects and financial advisers to arrive at realistic cost estimates for the projects and related fees. Estimated costs are budgeted amounts for each project.
**Project Budgets need to consider many variables such as fees for the DOE, contingencies, insurance, permits, bonds, etc.
State law prohibits the district from spending more than the amount on the ballot, and cost estimates include a contingency amount that accounts for spikes in things like material costs, gas prices, and interest rates.
Proposed 6-classroom addition
(2 rooms dedicated to small group instruction)
Proposed 2-classroom addition
(dedicated to music instruction)
Existing critical building systems are approaching or have exceeded their expected useful life. In some cases, replacement parts are becoming increasingly difficult to obtain, resulting in higher maintenance costs and reduced reliability. Replacing these systems now improve operational efficiency and help address facility needs before major failures occur.
Many of these infrastructure improvements will be necessary. Completing eligible projects through a referendum allows the district to receive debt service aid from the State, helping offset costs that may not be available if the same work is funded through future operating or capital expenditures.
Boiler Replacement
Burglar Alarm Replacement
Electrical Service Upgrade
Fire Alarm Replacement
Lower Gym Window Replacement
Lighting and Ceiling Replacement
Roof Replacement
Rooftop HVAC Unit Replacement
Classroom Unit Ventilator Replacement
Asbestos Abatement
Currently, Rockaway Valley School is making the best use of its existing spaces, many of which were constructed more than 50 years ago. While the school has adapted over time to accommodate evolving instructional programs and student support services, it is no longer meeting the needs of students and staff.
Art Room ADA-Compliance Renovation
Nurse Office ADA-Compliance Renovation
Building addition consisting of:
Instrumental and Choral Music rooms (2)
General classrooms (4)
Small group instruction (2)
Reconfiguration, development, or modification of instructional space to meet the needs of small groups
Renovation and expansion of the existing science classroom